Work record / Operating / A&E Pre-Construction Partner
A&E Pre-Construction Partner: I sold the project and the drawings followed
A national A&E pre-construction firm makes sealed drawings for builders in any state. They needed the owners and general contractors on the other side of those drawings, and I took the seat of Operating Partner to build that side with them.
The seat
I am Operating Partner to a national A&E pre-construction firm, working through Common Ground, with the construction side running through LÏEF Builders. They came to us for go-to-market strategy, relationships and growth. Once I had seen how the firm actually worked inside, the relationship grew from advice into a build partnership.
| Sector | Architecture, engineering and construction |
|---|---|
| Type of work | Go-to-market strategy, construction channel and talent generation |
| Where | National, with the first projects in Arizona |
| Years | 2026 to present |
| How long | Ongoing since 2026 |
| Through | Common Ground, with construction through LÏEF Builders |
| Credits | Common Ground Jesse Fowler, Operating Partner |
What I was brought in to decide
The firm is a national A&E pre-construction firm. A builder sends a site and a program, and a production team returns a permit set covering architecture, structure, mechanical, electrical, plumbing and civil work, plus code review and filing. An architect or engineer licensed in the project's state puts a seal on it.
Their own offer to partners was white-label production, a referral program and joint bids on commercial work. Each of those assumed that making drawings was the hard part. I did not agree. Nobody buys a permit set for its own sake. The buyer wants a building at a price he trusts, with a contractor who will sign for it. That is the half of the market the firm lacked, so I started there, with owners.
I also decided to ask about the seal before I lent anyone's network. After twelve years of sourcing and employing architects and engineers, I know where liability sits in this business. It sits in the stamp, and a failed stamp falls on whoever made the introduction. The engagement now has two lanes: a construction channel, and talent generation and business development. We are not engaged to place hires, and the work continues.
What we did
- I changed the order of the pitch. The firm's version waited on someone else to deliver a project. We bring the lead and the owner relationship, LÏEF Builders prices and packages the job so it can be bid, and the firm draws and seals while its general contractors build.
- My first move was a short diligence brief on September 1, 2026, a few days after we first spoke. It was a ranked list of questions, not a pitch. It put the stamp chain first: who seals, in which states, under what firm registration, whether the drafting team is employed or subcontracted, and whether the errors-and-omissions policy follows a drawing issued under another firm's name.
- I did not open the network to them. From September 8 to 10 we put five live projects into a plans-only room. Each had a synopsis, our takeoff with its assumptions and open questions laid out, and the drawings. We had built a full bid form and I pulled it before it went out, because I wanted the contractors' own numbers. We also asked each partner for its floor, the lowest number it would still take the work at.
- I wanted every contractor to price the same quantities. Kanopi measures a project once, and each contractor bids from that measurement. Any gap between bids then reflects rates, crews or risk, since nobody is reading the drawings differently. On September 10 we loaded the firm's price card into Kanopi as a price book of its own. Every partner number gets a match, review or conflict flag, line by line, before an owner ever sees it.
- A comparison package reached one of their contractors on September 16, and his proposal arrived the next morning. We diffed it line by line. Much of it tracked our takeoff, and we counted that as the system doing its job. We kept only the lines with independent pricing and loaded those as his signal, because a partner's number tells you something only if you know which part is his.
- Their contractors needed a way in that did not expose our numbers, so we built a password-protected bid portal. It opened September 21. Inside, a contractor can see which projects are open for bid and download the plans and takeoffs. A day of auditing turned up three fields nobody had thought to hide, and each was closed the day we found it. Now every partner view names the fields it is allowed to show.
- On September 15 I sent the Kanopi overview, and the first reply asked whether contractors would be licensing the software. They would not. The overview spent three pages on what the engine does and never said what the deal was. Now anything a partner reads opens with one sentence stating the deal.
- Having seen how the firm operates, I moved us from advisor to build partner. That runs through LÏEF Builders, which does pre-construction, general construction and owner-side work across the country.
- For sourcing, we built the firm its own learning CRM. It carries what 25 years and more than $1 billion in projects facilitated taught us about what roles cost, who owns which duties on an architecture and engineering team, and what architectural budgets can support. It also draws on our network of firms licensed in every state. On its own it combs every state's licensed-architect lists and the fractional and profile sites where independent architects turn up. It confirms licensure and scope of practice for each state before a name reaches the firm, drafts customized first messages, logs every follow-up and grows the network with each contact.
- Most of our relationships with architects start with work. An architect typically wants projects, and since we hold a large network of construction projects, I can often start by connecting one with something in their region. That gives them a reason to know us long before any role exists. Our weekly pipeline review begins with a fresh, verified list. We check where licensed coverage runs thin as the project map grows, which candidates are waiting on a next step, and which sources and messages are drawing replies, and then we move the sourcing toward what works.
Results
- For the firm we have sourced 14 licensed architects and engineers and delivered 26 general contractors that suit their model.
- Placements are not what they hired us for, which is talent generation. Still, the Phoenix area has seen two general contractors and one architect placed.
- In the last two and a half months we have brought more than $120 million in projects to bid through their construction estimating nationwide.
- The first contractor proposal came in the morning after the package went out. On October 7, 2026, their general contractor group told us it is bidding a commercial building in Phoenix as the contractor.
- The relationship became a build partnership through LÏEF Builders, and each owner relationship stays with the person who earned it.
The lesson
A drawing firm's missing piece is the owner who will pay for a building. Start there, check the seal before you lend your network, and say the deal in one sentence before you describe a single capability.
Public record
Questions about A&E Pre-Construction Partner, answered
Firm record
Common Ground keeps its own account of this engagement: A&E Pre-Construction Partner on the Common Ground wiki.