Carroll Shelby International, Gardena: questions answered

What people ask me about Carroll Shelby International, Gardena, and my answers. The project itself has its own page.

When demolition exposed the barrel ceiling, how did the client come around to making it the centerpiece?

Nobody needed convincing. It came down to preliminary demolition, which I believe in. Many contractors leave the walls shut on a renovation because whatever turns up invites change orders. I would sooner know. It takes little: cut a few quick holes, look, patch. You learn how the wall is built, how the structure ties together, what the hold-downs look like and, in this case, what the ceiling looked like. We did it before the plan was approved, not after, so the change of direction came early and easily. When everyone saw the barrel ceiling, we all agreed.

How did working in separate phases change the way the job ran and how the next award was won?

Our history with Shelby was long: the retail store, their building, the owner-side lead work in Las Vegas. Honestly the next award was ours to lose. We never asked for a master agreement. Each phase was bid alone, so they could say no after any of them, and each success built on the one before. Mostly it was paperwork and talking. Construction always has a problem somewhere, and the way through is to state what will happen and record it well. We did.

How did you control dust, noise and crew access while building the store next to a garage full of valuable cars?

Location helped, since the store was at the far corner of the lot. Beyond that we did two things. There was one door into the garage where the expensive cars were kept. Instead of hanging plastic over it, we closed it off with a sealed temporary wall. The employees in the small office upstairs we relocated to open space in the Shelby Building, a few hundred yards off, and walled that section off too. Plastic lets dust creep into everything. Whenever you can build a sealed temporary wall, it is the better answer.

Did the store open in time for the annual car show?

It did, though barely. The client called us about four months out from the annual Carroll Shelby car show, held on the property, so the show date set our deadline. The full build-out took 60 days from start to finish, and the store was ready. Stocking it was easy, since Shelby's name is on so many products that filling the shelves took care of itself. The hard part was finishing the build in time.

What won the phase that came after the store?

The store alone did not win it. By then we had done so much for them that these projects were ours to lose. The whole body of work earned the next phase.

What did you have to coordinate to build a store inside a working licensing office?

We designed and built the store inside an office that was still operating, so we worked around all their employees, all their cars and the desks upstairs. Many of their most expensive cars sat in the space next door. Whenever you move people and costly vehicles around, and your crews or subcontractors work near those vehicles, you need an added layer of protection and carry added risk.

What had to go right for the mural to win over people who had never seen a proposal?

The job came down to reproducing his signature accurately at full scale, and I had an excellent artist for it. The brief was the Shelby insignia, the blue racing stripes, and Carroll Shelby's actual signature. At night we set an outdoor projector on the lot. The signature went huge on one wall and the insignia on the opposite wall. The artist climbed a ladder, penciled along the projection, then filled it in. The prep ran beyond what the price allowed for, but I enjoyed it, and the city saw the finished wall before telling us to leave it up.

How did you keep the projected signature accurate, and how did you know the finished image was ready for the city?

Because the artist traced right from the projection, the signature stayed true at full size. Deciding it was ready was like judging any artwork: our call, made by eye. We made a few tweaks, but in the end we looked at it and decided whether it was right.

Was the mural part of the 60-day store build?

No. The mural stood apart with no deadline. It was basically one trade, staffed by a couple of painters and artists, nothing like an assembly line and low in risk.