Panel system against stick framing on a 204-unit Nevada multifamily

A developer's budget assumed stick framing, the method every lender in that market already knows how to underwrite. We were asked to price the panel system against it, and I wanted every constant where a reader could check it.

The seat

I did the value engineering for LÏEF Development in January 2026. The project is in Nevada.

SectorMultifamily development
Type of workValue engineering and system comparison
WhereNevada
YearsJanuary 2026
How longUnder one month
ThroughLÏEF Development
CreditsCommon Ground
Jesse Fowler, Value engineering, LÏEF Development

What I was brought in to decide

A developer carried a 204-unit multifamily project in Nevada: two-story duplex buildings sharing a party wall. The budget was stick-framed, the assumption that every contractor, appraiser and lender there already knows how to underwrite.

A manufacturer of a structural panel system, one LÏEF prices and builds, brought us the project. The ask was a budgetary comparison: the same building framed conventionally, then on the system. LÏEF had an interest in the low side, so the comparison said so up front and kept every constant where an outside reader could check it.

What we did

Results

The lesson

A rate is not a total. Give the number with its basis and stop, because a total is a separate claim that nobody has asked for yet.