LA Clippers practice facility: rebuilt room by room, never closed

An NBA team cannot hand its practice building to a contractor, so we never asked it to. We held the practice calendar fixed and moved the finish date around it.

The seat

I held both the design and the general contracting through Tellus Design and Build, from June 2017 to October 2018. That is sixteen months in Los Angeles. The work ran under the Tellus name.

SectorSports and entertainment facilities
Type of workPhased construction program
WhereLos Angeles
YearsJune 2017 to October 2018
How longSixteen months
ThroughTellus Design and Build
CreditsCommon Ground
Jesse Fowler, General contracting and design

What I was brought in to decide

The Clippers' practice facility is a working NBA building. Inside are locker rooms, rehab and performance space, areas for training and coaching, and a player lounge. The team is in it every day it is not on the road, through the season and playoffs, summer workouts, camps and rehab. No window is long enough to shut it and give it to a contractor.

The Clippers called Tellus Design and Build, then the top Google result for the work, to redesign and rebuild it. Tellus took on both design and general contracting. The program was a long list of small scopes, and the four rooms shared walls, hallways, air, water and power. Ownership and team operations both approved it.

What we did

Results

The lesson

Keep fixed the calendar the people actually use, and let the finish date bend around it. Never reverse that.

Stories from this work

Keeping an NBA team's building open while we rebuilt itTellus renovated an NBA team's practice facility over sixteen months while the team kept training inside it.Origin: Los Angeles County Museum of Art (LACMA)LACMA is the most prestigious name on my civic record, and I got there as a volunteer.Phasing a build so an NBA team kept trainingAn NBA practice facility had to stay in daily use through a sixteen-month rebuild, so I phased the work around the team's schedule.The change order that was not a changeA contractor billed a museum for site protection its own bid should have covered, and the contract showed it.

Questions about LA Clippers Practice Facility, answered

Firm record

Common Ground keeps its own account of this engagement: LA Clippers Practice Facility on the Common Ground wiki.